ITAC Assessment: GT0634
ITAC logo
ITAC Assessment: GT0634
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Hot Melt Adhesives
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 10,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 2,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,810 184,642
kWh
Electricity Demand $8,867 491
kW-mo/yr
Electricity Fees $877 -
Natural Gas $96,165 15,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,232

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2612: Use cooling tower water instead of refrigeration $290 $800 $290
15,240
kWh
- - - -
02 2.2511: Insulate bare equipment $1,600 $840 - - $1,600
-
MMBtu
- -
03 2.7314: Reduce ventilation air $1,900 $2,000 - - $1,900
-
MMBtu
- -
04 2.2514: Cover open tanks $80 $300 - - $80
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $932 $3,180 $347
13,189
kWh
$585
-
kW-mo/yr
- - -
06 2.1113: Reduce combustion air flow to optimum $1,220 - - - $2,120
-
MMBtu
$(-900.0) -
07 4.213: Purchase material from supplier in customized packaging $2,730 $780 - - - - $2,730
TOTAL RECOMMENDED $8,752 $7,900 $637
28,429
kWh
$585
-
kW-mo/yr
$5,700
-
MMBtu
$(-900.0) $2,730
TOTAL IMPLEMENTED $2,232 $3,480 $347
13,189
kWh
$585
-
kW-mo/yr
$2,200
-
MMBtu
$(-900.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs