Assessment Year | 1998 |
---|---|
Principal Product | Hot Melt Adhesives |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $1 M to 5M |
# of Employees | 16 |
Plant Area |
10,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,810 | 184,642 |
kWh
|
$0.026 |
Electricity Demand | $8,867 | 491 |
kW-mo/yr
|
$18.06 |
Electricity Fees | $877 | - |
|
- |
Natural Gas | $96,165 | 15,773 |
MMBtu
|
$6.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,232 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $290 | $800 |
$290
15,240
kWh
|
- | - | - | - | |
02 | 2.2511: Insulate bare equipment | $1,600 | $840 | - | - |
$1,600
-
MMBtu
|
- | - | |
03 | 2.7314: Reduce ventilation air | $1,900 | $2,000 | - | - |
$1,900
-
MMBtu
|
- | - | |
04 | 2.2514: Cover open tanks | $80 | $300 | - | - |
$80
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $932 | $3,180 |
$347
13,189
kWh
|
$585
-
kW-mo/yr
|
- | - | - | |
06 | 2.1113: Reduce combustion air flow to optimum | $1,220 | - | - | - |
$2,120
-
MMBtu
|
$(-900.0) | - | |
07 | 4.213: Purchase material from supplier in customized packaging | $2,730 | $780 | - | - | - | - | $2,730 | |
TOTAL RECOMMENDED | $8,752 | $7,900 |
$637
28,429
kWh
|
$585
-
kW-mo/yr
|
$5,700
-
MMBtu
|
$(-900.0) | $2,730 | ||
TOTAL IMPLEMENTED | $2,232 | $3,480 |
$347
13,189
kWh
|
$585
-
kW-mo/yr
|
$2,200
-
MMBtu
|
$(-900.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs