| Assessment Year | 1998 |
|---|---|
| Principal Product | Hot Melt Adhesives |
| NAICS |
n/a
|
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $1 M to 5M |
| # of Employees | 16 |
| Plant Area |
10,000
ft2
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $4,810 | 184,642 |
kWh
|
$0.026 |
| Electricity Demand | $8,867 | 491 |
kW-mo/yr
|
$18.06 |
| Electricity Fees | $877 | - |
|
- |
| Natural Gas | $96,165 | 15,773 |
MMBtu
|
$6.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,232 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2612: Use cooling tower water instead of refrigeration | $290 | $800 |
$290
15,240
kWh
|
- | - | - | - | |
| 02 | 2.2511: Insulate bare equipment | $1,600 | $840 | - | - |
$1,600
-
MMBtu
|
- | - | |
| 03 | 2.7314: Reduce ventilation air | $1,900 | $2,000 | - | - |
$1,900
-
MMBtu
|
- | - | |
| 04 | 2.2514: Cover open tanks | $80 | $300 | - | - |
$80
-
MMBtu
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $932 | $3,180 |
$347
13,189
kWh
|
$585
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.1113: Reduce combustion air flow to optimum | $1,220 | - | - | - |
$2,120
-
MMBtu
|
$(-900.0) | - | |
| 07 | 4.213: Purchase material from supplier in customized packaging | $2,730 | $780 | - | - | - | - | $2,730 | |
| TOTAL RECOMMENDED | $8,752 | $7,900 |
$637
28,429
kWh
|
$585
-
kW-mo/yr
|
$5,700
-
MMBtu
|
$(-900.0) | $2,730 | ||
| TOTAL IMPLEMENTED | $2,232 | $3,480 |
$347
13,189
kWh
|
$585
-
kW-mo/yr
|
$2,200
-
MMBtu
|
$(-900.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs