ITAC Assessment: DS0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Thermal-formed trays
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 77,000
ft2
Annual Production 1,220,259
lb
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,489 3,984,760
kWh
Electricity Demand $84,200 11,112
kW-mo/yr
Electricity Fees $25,875 -
Natural Gas $25,268 4,860
MMBtu
LPG $700 56
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $3,708 $1,337 - - $3,708
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $725 $96 $725
23,447
kWh
- - - -
03 2.3212: Optimize plant power factor $1,540 $2,100 - $1,540 - - -
04 2.7261: Install timers and/or thermostats $2,005 $330 - - $2,005
-
MMBtu
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $832 $4,230 - - - $832
-
lb
-
06 4.425: Eliminate/reduce redundant inspections $66,482 $72,000 - - - - $66,482
TOTAL RECOMMENDED $75,292 $80,093 $725
23,447
kWh
$1,540 $5,713
-
MMBtu
$832
-
lb
$66,482
TOTAL IMPLEMENTED $3,545 $2,430 - $1,540 $2,005
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs