Assessment Year | 2000 |
---|---|
Principal Product | Thermal-formed trays |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
77,000
ft2
|
Annual Production | 1,220,259
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,489 | 3,984,760 |
kWh
|
$0.031 |
Electricity Demand | $84,200 | 11,112 |
kW-mo/yr
|
$7.58 |
Electricity Fees | $25,875 | - |
|
- |
Natural Gas | $25,268 | 4,860 |
MMBtu
|
$5.20 |
LPG | $700 | 56 |
MMBtu
|
$12.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,545 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $3,708 | $1,337 | - | - |
$3,708
-
MMBtu
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $725 | $96 |
$725
23,447
kWh
|
- | - | - | - | |
03 | 2.3212: Optimize plant power factor | $1,540 | $2,100 | - | $1,540 | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $2,005 | $330 | - | - |
$2,005
-
MMBtu
|
- | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $832 | $4,230 | - | - | - |
$832
-
lb
|
- | |
06 | 4.425: Eliminate/reduce redundant inspections | $66,482 | $72,000 | - | - | - | - | $66,482 | |
TOTAL RECOMMENDED | $75,292 | $80,093 |
$725
23,447
kWh
|
$1,540 |
$5,713
-
MMBtu
|
$832
-
lb
|
$66,482 | ||
TOTAL IMPLEMENTED | $3,545 | $2,430 | - | $1,540 |
$2,005
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs