| Assessment Year | 2000 |
|---|---|
| Principal Product | Thermal-formed trays |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
77,000
ft2
|
| Annual Production | 1,220,259
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $123,489 | 3,984,760 |
kWh
|
$0.031 |
| Electricity Demand | $84,200 | 11,112 |
kW-mo/yr
|
$7.58 |
| Electricity Fees | $25,875 | - |
|
- |
| Natural Gas | $25,268 | 4,860 |
MMBtu
|
$5.20 |
| LPG | $700 | 56 |
MMBtu
|
$12.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,545 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $3,708 | $1,337 | - | - |
$3,708
-
MMBtu
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $725 | $96 |
$725
23,447
kWh
|
- | - | - | - | |
| 03 | 2.3212: Optimize plant power factor | $1,540 | $2,100 | - | $1,540 | - | - | - | |
| 04 | 2.7261: Install timers and/or thermostats | $2,005 | $330 | - | - |
$2,005
-
MMBtu
|
- | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $832 | $4,230 | - | - | - |
$832
-
lb
|
- | |
| 06 | 4.425: Eliminate/reduce redundant inspections | $66,482 | $72,000 | - | - | - | - | $66,482 | |
| TOTAL RECOMMENDED | $75,292 | $80,093 |
$725
23,447
kWh
|
$1,540 |
$5,713
-
MMBtu
|
$832
-
lb
|
$66,482 | ||
| TOTAL IMPLEMENTED | $3,545 | $2,430 | - | $1,540 |
$2,005
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs