ITAC Assessment: DL0122
ITAC logo
ITAC Assessment: DL0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Utility Plant
NAICS 221330: Steam and Air-Conditioning Supply
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 16
Plant Area 48,313
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,681,559 37,961,072
kWh
Natural Gas $1,372,391 261,114
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $252,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1231: Establish burner maintenance schedule for boilers $4,734 $1,000 - $4,734
-
MMBtu
02 2.2628: Utilize a less expensive cooling method $16,470 $4,000 $16,470
233,298
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $97,586 $350,000 $97,586
1,382,240
kWh
-
04 2.4112: Install soft-start to eliminate nuisance trips $134,000 $150,000 $134,000
1,898,000
kWh
-
TOTAL RECOMMENDED $252,790 $505,000 $248,056
3,513,538
kWh
$4,734
-
MMBtu
TOTAL IMPLEMENTED $134,000 $150,000 $134,000
1,898,000
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs