Assessment Year | 2016 |
---|---|
Principal Product | Temperature Control Equipment |
NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 94 |
Plant Area |
75,000
ft2
|
Annual Production | 2,000
units
|
Production Hrs. Annual | 2,990
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,458 | 744,800 |
kWh
|
$0.096 |
Electricity Demand | $32,642 | 3,876 |
kW-mo/yr
|
$8.42 |
Electricity Fees | $523 | - |
|
- |
Natural Gas | $32,316 | 4,868 |
MMBtu
|
$6.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,915 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $1,296 | $50 | - | - | $1,296 | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $245 | $35 |
$181
2,621
kWh
|
$64
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7135: Install occupancy sensors | $2,012 | $810 |
$1,248
18,049
kWh
|
$640
-
kW-mo/yr
|
- | - | $124 | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,967 | $4,500 |
$1,254
18,139
kWh
|
$2,570
-
kW-mo/yr
|
- |
$(-857.0)
-
MMBtu
|
- | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $10,803 | $9,350 | - | - | - |
$10,803
-
MMBtu
|
- | - | |
06 | 2.7314: Reduce ventilation air | $7,691 | $28,200 |
$(-1,960.0)
(-28,348)
kWh
|
$(-1,024.0)
-
kW-mo/yr
|
- |
$10,675
-
MMBtu
|
- | - | |
07 | 2.7314: Reduce ventilation air | $1,533 | - |
$92
1,333
kWh
|
$25
-
kW-mo/yr
|
- |
$1,416
-
MMBtu
|
- | - | |
08 | 3.5316: Contract a wood pallet recycling company | $1,368 | - | - | - | - | - | - | $1,368 | |
TOTAL RECOMMENDED | $27,915 | $42,945 |
$815
11,794
kWh
|
$2,275
-
kW-mo/yr
|
$1,296 |
$22,037
-
MMBtu
|
$124 | $1,368 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs