ITAC Assessment: MZ1016
ITAC logo
ITAC Assessment: MZ1016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Hotel
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range less than $500
k
# of Employees 23
Plant Area 91,800
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,491 758,300
kWh
Electricity Demand $27,377 1,401
kW-mo/yr
Natural Gas $23,622 2,206
MMBtu
Waste Disposal Costs
Water Usage $20,968 3,083
Tgal
Water Disposal $13,466 3,083
Tgal
TOTAL YEARLY COSTS $143,924
RECOMMENDED SAVINGS* $14,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 4.652: Replace existing equipment with more suitable substitutes $3,556 $8,000 - - $3,556
-
MMBtu
- -
02 4.652: Replace existing equipment with more suitable substitutes $178 $2,000 $39
498
kWh
$16
-
kW-mo/yr
- $75
-
Tgal
$48
-
Tgal
03 3.4151: Minimize water usage $5,716 $2,500 - - $2,738
-
MMBtu
$2,978
-
Tgal
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,026 $6,750 $2,026
26,325
kWh
- - - -
05 2.2628: Utilize a less expensive cooling method $2,671 $3,750 $911
11,826
kWh
$1,760
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $71 $475 $71
911
kWh
- - - -
TOTAL RECOMMENDED $14,218 $23,475 $3,047
39,560
kWh
$1,776
-
kW-mo/yr
$6,294
-
MMBtu
$3,053
-
Tgal
$48
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs