| Assessment Year | 2025 |
|---|---|
| Principal Product | Hotel |
| NAICS | 721110: Hotels (except Casino Hotels) and Motels |
| SIC | 7011: Hotels and Motels |
| Sales Range | less than $500 k |
| # of Employees | 23 |
| Plant Area |
91,800
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $58,491 | 758,300 |
kWh
|
$0.077 | |
| Electricity Demand | $27,377 | 1,401 |
kW-mo/yr
|
$19.54 | |
| Natural Gas | $23,622 | 2,206 |
MMBtu
|
$10.71 | |
| Waste Disposal Costs | |||||
| Water Usage | $20,968 | 3,083 |
Tgal
|
$6.80 | |
| Water Disposal | $13,466 | 3,083 |
Tgal
|
$4.37 | |
| TOTAL YEARLY COSTS | $143,924 | ||||
| RECOMMENDED SAVINGS* | $14,218 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $3,556 | $8,000 | - | - |
$3,556
-
MMBtu
|
- | - | |
| 02 | 4.652: Replace existing equipment with more suitable substitutes | $178 | $2,000 |
$39
498
kWh
|
$16
-
kW-mo/yr
|
- |
$75
-
Tgal
|
$48
-
Tgal
|
|
| 03 | 3.4151: Minimize water usage | $5,716 | $2,500 | - | - |
$2,738
-
MMBtu
|
$2,978
-
Tgal
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,026 | $6,750 |
$2,026
26,325
kWh
|
- | - | - | - | |
| 05 | 2.2628: Utilize a less expensive cooling method | $2,671 | $3,750 |
$911
11,826
kWh
|
$1,760
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $71 | $475 |
$71
911
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $14,218 | $23,475 |
$3,047
39,560
kWh
|
$1,776
-
kW-mo/yr
|
$6,294
-
MMBtu
|
$3,053
-
Tgal
|
$48
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs