ITAC Assessment: UF0517
ITAC logo
ITAC Assessment: UF0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Subsea Umbilical Cords
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $100
M
to 500
M
# of Employees 165
Plant Area 200,000
ft2
Annual Production 1,626
units
Production Hrs. Annual 6,912
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $656,556 7,053,009
kWh
Waste Disposal Costs
Water Usage $52,835 2,988
Tgal
TOTAL YEARLY COSTS $709,391
RECOMMENDED SAVINGS* $233,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $233,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $131,032 $232,640 $131,032
1,408,942
kWh
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $39,058 $11,918 $39,058
419,975
kWh
- -
03 2.4133: Use most efficient type of electric motors $20,334 $78,376 $20,334
218,645
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $21,928 - $21,597
232,224
kWh
$150 $181
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,845 $9,000 $11,845
127,364
kWh
- -
06 2.6218: Turn off equipment when not in use $8,963 - $8,963
96,372
kWh
- -
TOTAL RECOMMENDED $233,160 $331,934 $232,829
2,503,522
kWh
$150 $181
TOTAL IMPLEMENTED $233,160 $331,934 $232,829
2,503,522
kWh
$150 $181
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs