| Assessment Year | 2018 |
|---|---|
| Principal Product | Subsea Umbilical Cords |
| NAICS | 335929: Other Communication and Energy Wire Manufacturing |
| SIC | 3357: Drawing and Insulating of Nonferrous Wire |
| Sales Range | $100 M to 500M |
| # of Employees | 165 |
| Plant Area |
200,000
ft2
|
| Annual Production | 1,626
units
|
| Production Hrs. Annual | 6,912
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $656,556 | 7,053,009 |
kWh
|
$0.093 | |
| Waste Disposal Costs | |||||
| Water Usage | $52,835 | 2,988 |
Tgal
|
$17.68 | |
| TOTAL YEARLY COSTS | $709,391 | ||||
| RECOMMENDED SAVINGS* | $233,160 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $233,160 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $131,032 | $232,640 |
$131,032
1,408,942
kWh
|
- | - | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $39,058 | $11,918 |
$39,058
419,975
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $20,334 | $78,376 |
$20,334
218,645
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $21,928 | - |
$21,597
232,224
kWh
|
$150 | $181 | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,845 | $9,000 |
$11,845
127,364
kWh
|
- | - | |
| 06 | 2.6218: Turn off equipment when not in use | $8,963 | - |
$8,963
96,372
kWh
|
- | - | |
| TOTAL RECOMMENDED | $233,160 | $331,934 |
$232,829
2,503,522
kWh
|
$150 | $181 | ||
| TOTAL IMPLEMENTED | $233,160 | $331,934 |
$232,829
2,503,522
kWh
|
$150 | $181 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs