Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,781

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CW0115 #05 Y:2020 Recover and reuse cooling water $3,922 $10,595
CW0115 #04 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $333 $90
CW0115 #03 Y:2020 Use or replace with energy efficient substitutes $233 $22
CW0115 #02 Y:2020 Upgrade controls on compressors $1,893 $10,137
CW0115 #01 Y:2020 Install compressor air intakes in coolest locations $186 $1,350
SF0562 #07 Y:2020 Use solar heat to make electricty $26,796 $86,835
SF0562 #06 Y:2020 Recover waste heat from equipment $12,365 $55,965
SF0562 #05 Y:2020 Install occupancy sensors $1,641 $4,403
SF0562 #04 Y:2020 Reduce the pressure of compressed air to the minimum required $2,675 $4,975
SF0562 #03 Y:2020 Use / purchase optimum sized compressor $7,749 $13,469
SF0562 #02 Y:2020 Utilize higher efficiency lamps and/or ballasts $3,226 $2,592
SF0562 #01 Y:2020 Insulate bare equipment $1,259 $918
NC0655 #04 Y:2020 Eliminate or reduce compressed air usage $310 $500
NC0655 #03 Y:2020 Change rate schedules or other changes in utility service $12,039 $500
NC0655 #02 Y:2020 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $49,654 $612,000
NC0655 #01 Y:2020 Replace electrically-operated equipment with fossil fuel equipment $92,988 $168,000
GT0952 #09 Y:2020 Optimize plant power factor $300 $1,565
GT0952 #08 Y:2020 Turn off equipment when not in use $10,763 $18,887
GT0952 #07 Y:2020 Utilize energy-efficient belts and other improved mechanisms $1,264 $1,734
GT0952 #06 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $3,379 $1,850