ITAC Assessment: GT0952
ITAC logo
ITAC Assessment: GT0952
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Lighting
NAICS 335129: Other Lighting Equipment Manufacturing
SIC 3648: Lighting Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 750,000
ft2
Annual Production 1,700,000
units
Production Hrs. Annual 7,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $756,812 8,485,134
kWh
Natural Gas $77,183 14,836
MMBtu
TOTAL YEARLY COSTS $833,995
RECOMMENDED SAVINGS* $91,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.4226: Use / purchase optimum sized compressor $11,232 $200 $11,232
125,927
kWh
- -
02 2.8121: Apply for tax-free status for energy purchases $53,832 $2,000 - $53,832 -
03 2.6211: Conserve energy by efficient use of vending machines $304 $13 $304
3,411
kWh
- -
04 2.6218: Turn off equipment when not in use $4,488 $300 $4,488
50,316
kWh
- -
05 2.3132: Recharge batteries on during off-peak demand periods $5,728 $400 - $5,728 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,379 $1,850 $6,279
70,398
kWh
- $(-2,900.0)
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,264 $1,734 $1,264
14,198
kWh
- -
08 2.6218: Turn off equipment when not in use $10,763 $18,887 $10,763
120,931
kWh
- -
09 2.3212: Optimize plant power factor $300 $1,565 - $300 -
TOTAL RECOMMENDED $91,290 $26,948 $34,330
385,181
kWh
$59,861 $(-2,900.0)
TOTAL IMPLEMENTED $74,499 $6,096 $23,567
264,250
kWh
$53,832 $(-2,900.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs