Assessment Year | 2001 |
---|---|
Principal Product | Easter White Pine Boards |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 69 |
Plant Area |
3,600,000
ft2
|
Annual Production | 13,000
thousand feet
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $339,786 | 3,867,789 |
kWh
|
$0.088 |
Electricity Demand | $22,364 | 11,695 |
kW-mo/yr
|
$1.91 |
Electricity Fees | $10,979 | - |
|
- |
Fuel Oil #2 | $237,842 | 35,332 |
MMBtu
|
$6.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $116,736 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,447 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $46,732 | $5,000 |
$46,732
549,794
kWh
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $29,014 | $200,000 | n/a | - | - |
$29,014
-
MMBtu
|
- |
03 | 2.4311: Recover mechanical energy | $18,000 | $80,000 | n/a |
$8,000
94,118
kWh
|
- | - | $10,000 |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,346 | $19,000 |
$9,346
109,958
kWh
|
- | - | - | |
05 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $6,536 | $24,000 | - |
$6,536
-
MMBtu
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,263 | $13,000 | - | - |
$5,263
-
MMBtu
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $610 | $2,700 |
$610
7,175
kWh
|
- | - | - | |
08 | 2.2122: Install / repair insulation on condensate lines | $476 | $500 | - | - |
$476
-
MMBtu
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $759 | - |
$759
8,930
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $116,736 | $344,200 |
$65,447
769,975
kWh
|
$6,536
-
MMBtu
|
$34,753
-
MMBtu
|
$10,000 | ||
TOTAL IMPLEMENTED | $57,447 | $26,700 |
$57,447
675,857
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs