ITAC Assessment: MA0494
ITAC logo
ITAC Assessment: MA0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Easter White Pine Boards
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 69
Plant Area 3,600,000
ft2
Annual Production 13,000
thousand feet
Production Hrs. Annual 2,730
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,786 3,867,789
kWh
Electricity Demand $22,364 11,695
kW-mo/yr
Electricity Fees $10,979 -
Fuel Oil #2 $237,842 35,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,732 $5,000 $46,732
549,794
kWh
- - -
02 2.2437: Recover waste heat from equipment $29,014 $200,000 n/a - - $29,014
-
MMBtu
-
03 2.4311: Recover mechanical energy $18,000 $80,000 n/a $8,000
94,118
kWh
- - $10,000
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,346 $19,000 $9,346
109,958
kWh
- - -
05 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $6,536 $24,000 - $6,536
-
MMBtu
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,263 $13,000 - - $5,263
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $610 $2,700 $610
7,175
kWh
- - -
08 2.2122: Install / repair insulation on condensate lines $476 $500 - - $476
-
MMBtu
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $759 - $759
8,930
kWh
- - -
TOTAL RECOMMENDED $116,736 $344,200 $65,447
769,975
kWh
$6,536
-
MMBtu
$34,753
-
MMBtu
$10,000
TOTAL IMPLEMENTED $57,447 $26,700 $57,447
675,857
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs