ITAC Assessment: MA0138
ITAC logo
ITAC Assessment: MA0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product COSMETIC MIRRORS
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 205
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,860
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,962 1,505,862
kWh
Natural Gas $52,348 9,602
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $201 $150 $201
2,638
kWh
- -
02 2.7261: Install timers and/or thermostats $13,920 $448 $3,669
48,066
kWh
$10,251
-
MMBtu
-
03 2.7226: Use computer programs to optimize hvac performance $671 $6,000 $671
8,792
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $229 $100 - $349
-
MMBtu
$(-120.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,901 $458 $1,901
24,912
kWh
- -
06 2.6232: Install set-back timers $118 $354 $118
1,465
kWh
- -
07 2.7224: Reduce space conditioning during non-working hours $1,812 $520 $1,812
23,740
kWh
- -
08 2.1221: Replace obsolete burners with more efficient ones $1,461 $3,000 - $1,461
-
MMBtu
-
09 2.1221: Replace obsolete burners with more efficient ones $2,806 $10,500 - $2,806
-
MMBtu
-
TOTAL RECOMMENDED $23,119 $21,530 $8,372
109,613
kWh
$14,867
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $22,330 $15,176 $7,583
99,356
kWh
$14,867
-
MMBtu
$(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs