ITAC Assessment: AM0407
ITAC logo
ITAC Assessment: AM0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product compressed air tools
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 30,000
ft2
Annual Production 41,850
pieces
Production Hrs. Annual 5,749
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,641 690,411
kWh
Electricity Demand $26,918 3,786
kW-mo/yr
LPG $6,415 412
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,330 $300 $1,330
49,200
kWh
- -
02 3.7198: Reduce / eliminate use of disposable product $920 $699 - - $920
-
lb
03 2.7111: Reduce illumination to minimum necessary levels $690 $210 $290
10,600
kWh
$400
-
kW-mo/yr
-
04 2.7124: Make a practice of turning off lights when not needed $190 - $120
4,340
kWh
$70
-
kW-mo/yr
-
05 3.7132: Reuse rags until completely soiled $180 - - - $180
-
lb
TOTAL RECOMMENDED $3,310 $1,209 $1,740
64,140
kWh
$470
-
kW-mo/yr
$1,100
-
lb
TOTAL IMPLEMENTED $1,700 $300 $1,450
53,540
kWh
$70
-
kW-mo/yr
$180
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs