ITAC Assessment: UM0209
ITAC logo
ITAC Assessment: UM0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Wear Resistant Alloys
NAICS
n/a
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 31
Plant Area 13,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,011 212,000
kWh
Electricity Fees $1,296 -
Natural Gas $2,763 620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,007 $7,427 $3,007
30,339
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,675 $500 $2,675
27,000
kWh
-
03 2.6218: Turn off equipment when not in use $363 $100 $363
3,680
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $298 $100 $298
2,944
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $223 $1,229 - $223
-
MMBtu
TOTAL RECOMMENDED $6,566 $9,356 $6,343
63,963
kWh
$223
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs