ITAC Assessment: SF0562
ITAC logo
ITAC Assessment: SF0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Women's Apparel
NAICS 315240: Women’s, Girls’, and Infants’ Cut and Sew Apparel Manufacturing
SIC 2331: Women's, Misses', and Juniors' Blouses and Shirts
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 19,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,498 184,720
kWh
Electricity Fees $9,589 -
Natural Gas $44,102 3,570
MMBtu
Waste Disposal Costs
Water Usage $41,190 2,300
Tgal
TOTAL YEARLY COSTS $135,379
RECOMMENDED SAVINGS* $55,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 2.2511: Insulate bare equipment $1,259 $918 - $1,259
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,226 $2,592 $2,598
9,230
kWh
- $628
03 2.4226: Use / purchase optimum sized compressor $7,749 $13,469 $7,749
27,527
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,675 $4,975 $2,675
9,503
kWh
- -
05 2.7135: Install occupancy sensors $1,641 $4,403 $1,641
5,830
kWh
- -
06 2.2437: Recover waste heat from equipment $12,365 $55,965 - $12,365
-
MMBtu
-
07 2.9114: Use solar heat to make electricty $26,796 $86,835 $26,796
95,189
kWh
- -
TOTAL RECOMMENDED $55,711 $169,157 $41,459
147,279
kWh
$13,624
-
MMBtu
$628
TOTAL IMPLEMENTED $43,646 $146,310 $29,394
104,419
kWh
$13,624
-
MMBtu
$628
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Product Savings