ITAC Assessment: BS0044
ITAC logo
ITAC Assessment: BS0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Seafood
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 189
Plant Area 35,000
ft2
Annual Production 55,000,000
lb
Production Hrs. Annual 6,480
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,000,310 6,965,760
kWh
Electricity Demand $116,263 20,505
kW-mo/yr
Fuel Oil #2 $259,082 14,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $237,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $170,064 $46,000 - - $170,064
-
MMBtu
- - -
02 3.4154: Eliminate leaks in water lines and valves $2,822 $2,600 - - - $3,272
-
Tgal
$(-450.0) -
03 2.2511: Insulate bare equipment $338 $893 - - $338
-
MMBtu
- - -
04 2.2621: Modify refrigeration system to operate at a lower pressure $26,828 $9,000 $25,307
176,234
kWh
$1,521
-
kW-mo/yr
- - - -
05 2.2515: Use optimum thickness insulation $9,004 $6,600 $9,004
62,703
kWh
- - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,633 $872 $11,180
77,853
kWh
$1,453
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,856 $10,866 $4,265
29,701
kWh
$591
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,695 $10,868 $3,443
23,976
kWh
$252
-
kW-mo/yr
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,126 $1,190 $4,963
34,560
kWh
$163
-
kW-mo/yr
- - - -
10 2.7135: Install occupancy sensors $2,041 $610 $1,993
13,877
kWh
- - - - $48
TOTAL RECOMMENDED $237,407 $89,499 $60,155
418,904
kWh
$3,980
-
kW-mo/yr
$170,402
-
MMBtu
$3,272
-
Tgal
$(-450.0) $48
TOTAL IMPLEMENTED $60,446 $32,023 $53,897
375,326
kWh
$3,389
-
kW-mo/yr
$338
-
MMBtu
$3,272
-
Tgal
$(-450.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs