Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,190

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0040 #04 Y:2002 Change rate schedules or other changes in utility service $2,285 -
UU0040 #03 Y:2002 Reschedule plant operations or reduce load to avoid peaks $2,957 -
UU0040 #02 Y:2002 Utilize a less expensive cooling method $150 -
UU0040 #01 Y:2002 Optimize plant power factor $1 -
OR0428 #07 Y:2002 Re-arrange equipment layout to reduce labor costs $400 $1,970
OR0428 #06 Y:2002 Utilize energy-efficient belts and other improved mechanisms $688 $2,800
OR0428 #05 Y:2002 Insulate bare equipment $742 $1,320
OR0428 #04 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $437 $500
OR0428 #03 Y:2002 Use most efficient type of electric motors $743 $26
OR0428 #02 Y:2002 Eliminate or reduce compressed air usage $307 -
OR0428 #01 Y:2002 Combine utility meters $3,901 $7,500
GT0749 #08 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $41,444 $500
GT0749 #07 Y:2002 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $200,750 $814,000
GT0749 #06 Y:2002 Reduce combustion air flow to optimum $3,160 -
GT0749 #05 Y:2002 Make a practice of turning off lights when not needed $3,035 -
GT0749 #04 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $64,596 $238,800
GT0749 #03 Y:2002 Check for accuracy of utility / power meters $21,000 $8,220
GT0749 #02 Y:2002 Turn off equipment when not in use $27,457 -
GT0749 #01 Y:2002 Recharge batteries on during off-peak demand periods $233 -
UD0666 #16 Y:2002 Make a practice of turning off lights when not needed $175 -