Assessment Year | 2003 |
---|---|
Principal Product | Molded plastic parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
40,000
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $80,850 | 2,650,904 |
kWh
|
$0.030 |
Electricity Demand | $84,150 | 6,420 |
kW-mo/yr
|
$13.11 |
Natural Gas | $7,924 | 1,171 |
MMBtu
|
$6.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,542 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $59,492 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $21,034 | - | - |
$21,274
-
kW-mo/yr
|
$(-240.0) | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $16,698 | - |
$(-397.0)
(-14,208)
kWh
|
$19,015
-
kW-mo/yr
|
- | - | $(-1,920.0) | |
03 | 4.624: Hire additional personnel to reduce changeout time | $14,700 | - | - | - | - | - | $14,700 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,180 | - |
$2,635
94,080
kWh
|
$2,545
-
kW-mo/yr
|
- | - | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,885 | - |
$1,975
70,560
kWh
|
$1,910
-
kW-mo/yr
|
- | - | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,247 | $325 |
$322
11,490
kWh
|
$311
-
kW-mo/yr
|
- |
$2,614
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $3,082 | - |
$1,427
50,960
kWh
|
$1,655
-
kW-mo/yr
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,266 | $8,500 |
$1,152
41,160
kWh
|
$1,114
-
kW-mo/yr
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,000 | - |
$1,020
36,456
kWh
|
$980
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,000 | $2,020 |
$510
18,230
kWh
|
$490
-
kW-mo/yr
|
- | - | - | |
11 | 2.6212: Turn off equipment during breaks, reduce operating time | $835 | $1,700 |
$835
29,819
kWh
|
- | - | - | - | |
12 | 2.7122: Disconnect ballasts | $810 | - |
$410
14,700
kWh
|
$400
-
kW-mo/yr
|
- | - | - | |
13 | 2.7122: Disconnect ballasts | $740 | $100 |
$380
13,525
kWh
|
$360
-
kW-mo/yr
|
- | - | - | |
14 | 2.7132: Install timers on light switches in little used areas | $635 | $150 |
$635
22,640
kWh
|
- | - | - | - | |
15 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $255 | $720 |
$130
4,700
kWh
|
$125
-
kW-mo/yr
|
- | - | - | |
16 | 2.7124: Make a practice of turning off lights when not needed | $175 | - |
$175
6,250
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $76,542 | $13,515 |
$11,209
400,362
kWh
|
$50,179
-
kW-mo/yr
|
$(-240.0) |
$2,614
-
MMBtu
|
$12,780 | ||
TOTAL IMPLEMENTED | $59,492 | $2,020 |
$3,283
117,288
kWh
|
$43,669
-
kW-mo/yr
|
$(-240.0) | - | $12,780 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs