ITAC Assessment: GT0749
ITAC logo
ITAC Assessment: GT0749
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product BAKERY GOODS
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 382
Plant Area 51,363,918
ft2
Annual Production 41,999,871
lb
Production Hrs. Annual 2,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $619,064 11,664,798
kWh
Natural Gas $202,200 60,370
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $361,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $233 - n/a $233
18,304
kWh
- - - -
02 2.6218: Turn off equipment when not in use $27,457 - n/a $27,457
893,200
kWh
- - - -
03 2.8118: Check for accuracy of utility / power meters $21,000 $8,220 n/a - - - - $21,000
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $64,596 $238,800 n/a $35,412
1,018,368
kWh
$29,184
-
kW-mo/yr
- - -
05 2.7124: Make a practice of turning off lights when not needed $3,035 - n/a $3,035
87,279
kWh
- - - -
06 2.1113: Reduce combustion air flow to optimum $3,160 - n/a - - $5,660
-
MMBtu
$(-2,500.0) -
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $200,750 $814,000 n/a $253,700
3,000,000
kWh
- $(-52,950.0)
-
MMBtu
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $41,444 $500 n/a $30,715
762,551
kWh
$10,729
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $361,675 $1,061,520 $350,552
5,779,702
kWh
$39,913
-
kW-mo/yr
$(-47,290.0)
-
MMBtu
$(-2,500.0) $21,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs