ITAC Assessment: GT0430
ITAC logo
ITAC Assessment: GT0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DRAPERIES, BEDSPREADS
NAICS
n/a
SIC 2391: Curtains and Draperies
Sales Range n/a
# of Employees 168
Plant Area
n/a
Annual Production 25,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,915 1,002,931
kWh
Natural Gas $4,366 911
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,160 - $9,183
124,267
kWh
$(-2,023.0)
-
MMBtu
02 2.6214: Shut off pilots in standby equipment $100 - - $100
-
MMBtu
03 2.4133: Use most efficient type of electric motors $42 $322 $42
586
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $107 - $107
1,465
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $869 $400 $869
12,016
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,074 $2,300 $1,074
14,947
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $810 - $810
11,137
kWh
-
TOTAL RECOMMENDED $10,162 $3,022 $12,085
164,418
kWh
$(-1,923.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs