ITAC Assessment: UU0040
ITAC logo
ITAC Assessment: UU0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product frozen dessert
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range less than $500
k
# of Employees 11
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,284
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,128 113,679
kWh
Electricity Demand $3,917 492
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $1 - $1
-
kW-mo/yr
- -
02 2.2628: Utilize a less expensive cooling method $150 - - - $150
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,957 - $2,957
-
kW-mo/yr
- -
04 2.8114: Change rate schedules or other changes in utility service $2,285 - $2,285
-
kW-mo/yr
- -
05 2.1231: Establish burner maintenance schedule for boilers $1 - $1
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $57 $55 - $57
-
MMBtu
-
TOTAL RECOMMENDED $5,451 $55 $5,244
-
kW-mo/yr
$57
-
MMBtu
$150
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs