ITAC Assessment: OR0428
ITAC logo
ITAC Assessment: OR0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Granola, Tea
NAICS 311230: Breakfast Cereal Manufacturing
SIC 2043: Cereal Breakfast Foods
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 67,445
ft2
Annual Production 15,400,000
lb
Production Hrs. Annual 5,375
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,879 1,237,352
kWh
Electricity Demand $16,997 3,679
kW-mo/yr
Electricity Fees $1,820 -
Natural Gas $86,395 13,345
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8112: Combine utility meters $3,901 $7,500 - - $3,901 - -
02 2.4239: Eliminate or reduce compressed air usage $307 - $307
7,128
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $743 $26 $582
13,532
kWh
$161
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $437 $500 $365
8,491
kWh
$72
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $742 $1,320 - - - $742
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $688 $2,800 $544
12,632
kWh
$144
-
kW-mo/yr
- - -
07 4.513: Re-arrange equipment layout to reduce labor costs $400 $1,970 - - - - $400
TOTAL RECOMMENDED $7,218 $14,116 $1,798
41,783
kWh
$377
-
kW-mo/yr
$3,901 $742
-
MMBtu
$400
TOTAL IMPLEMENTED $1,887 $2,496 $1,254
29,151
kWh
$233
-
kW-mo/yr
- - $400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs