ITAC Assessment: AM0004
ITAC logo
ITAC Assessment: AM0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product TRUCKS BEDS & TRAILERS
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area
n/a
Annual Production 1,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,511 483,880
kWh
Natural Gas $15,475 3,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,556

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $1,995 - $1,995
18,171
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $151 $107 $151
1,758
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,143 $2,367 $1,143
12,309
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $97 $80 $97
1,758
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $595 $3,500 $595
4,689
kWh
-
06 2.6232: Install set-back timers $97 - $97
879
kWh
-
07 2.6232: Install set-back timers $421 - $421
4,396
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $170 - $170
1,172
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $505 $990 $505
5,275
kWh
-
10 2.2437: Recover waste heat from equipment $2,102 $1,585 - $2,102
-
MMBtu
11 2.8114: Change rate schedules or other changes in utility service $10,331 $13,800 $10,331
-
kWh
-
TOTAL RECOMMENDED $17,607 $22,429 $15,505
50,407
kWh
$2,102
-
MMBtu
TOTAL IMPLEMENTED $3,556 $2,554 $3,556
35,168
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs