2,223
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0292 #03 Y:1989 | 03 | 1989 | Reschedule plant operations or reduce load to avoid peaks | $1,528 | - | |
| UD0292 #02 Y:1989 | 02 | 1989 | Utilize higher efficiency lamps and/or ballasts | $1,465 | $233 | |
| UD0292 #01 Y:1989 | 01 | 1989 | Use proper thickness of insulation on building envelope | $664 | $2,400 | |
| UD0291 #05 Y:1989 | 05 | 1989 | Lower temperature during the winter season and vice-versa | $1,866 | $2,000 | |
| UD0291 #04 Y:1989 | 04 | 1989 | Use direct air supply to exhaust hoods | $2,237 | $4,000 | |
| UD0291 #03 Y:1989 | 03 | 1989 | Use only amount of air necessary to prevent explosion hazard | $851 | $500 | |
| UD0291 #02 Y:1989 | 02 | 1989 | Replace electrically-operated equipment with fossil fuel equipment | $2,832 | $15,000 | |
| UD0291 #01 Y:1989 | 01 | 1989 | Replace electrically-operated equipment with fossil fuel equipment | $2,548 | $6,000 | |
| UD0290 #06 Y:1989 | 06 | 1989 | Reduce illumination to minimum necessary levels | $2,146 | $465 | |
| UD0290 #05 Y:1989 | 05 | 1989 | Reduce glazed areas in buildings | $22,077 | $21,750 | |
| UD0290 #04 Y:1989 | 04 | 1989 | Keep lamps and reflectors clean | $6,394 | $11,600 | |
| UD0290 #03 Y:1989 | 03 | 1989 | Recover waste heat from equipment | $2,035 | $3,000 | |
| UD0290 #02 Y:1989 | 02 | 1989 | Use waste heat from hot flue gases to preheat | $5,658 | $8,000 | |
| UD0290 #01 Y:1989 | 01 | 1989 | Combine utility meters | $2,104 | $1,000 | |
| RU0058 #06 Y:1989 | 06 | 1989 | Use cooling tower or economizer to replace chiller cooling | $16,605 | $11,500 | |
| RU0058 #05 Y:1989 | 05 | 1989 | Air condition only space necessary | $2,996 | $7,200 | |
| RU0058 #04 Y:1989 | 04 | 1989 | Install compressor air intakes in coolest locations | $3,672 | $594 | |
| RU0058 #03 Y:1989 | 03 | 1989 | Reschedule plant operations or reduce load to avoid peaks | $13,950 | $2,500 | |
| RU0058 #02 Y:1989 | 02 | 1989 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,807 | - | |
| RU0058 #01 Y:1989 | 01 | 1989 | Utilize higher efficiency lamps and/or ballasts | $3,613 | $446 |