ITAC Assessment: UD0291
ITAC logo
ITAC Assessment: UD0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product GEAR BOX & MOTOR DRIVES
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 25,000
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,482 640,094
kWh
Natural Gas $10,300 2,396
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,548 $6,000 $3,111
29,015
kWh
$(-563.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,832 $15,000 $3,457
32,532
kWh
$(-625.0)
-
MMBtu
03 2.2532: Use only amount of air necessary to prevent explosion hazard $851 $500 $105
4,396
kWh
$746
-
MMBtu
04 2.7245: Use direct air supply to exhaust hoods $2,237 $4,000 $247
10,258
kWh
$1,990
-
MMBtu
05 2.7221: Lower temperature during the winter season and vice-versa $1,866 $2,000 $1,866
-
kWh
-
TOTAL RECOMMENDED $10,334 $27,500 $8,786
76,201
kWh
$1,548
-
MMBtu
TOTAL IMPLEMENTED $5,549 $17,500 $5,428
36,928
kWh
$121
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs