ITAC Assessment: UD0290
ITAC logo
ITAC Assessment: UD0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product WELDERS,AIRCRFT GRD POWER
NAICS
n/a
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 393
Plant Area
n/a
Annual Production 40,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $480,398 8,950,762
kWh
Natural Gas $205,075 49,655
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8112: Combine utility meters $2,104 $1,000 - $2,104
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $5,658 $8,000 - $5,658
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $2,035 $3,000 - $2,035
-
MMBtu
-
04 2.7123: Keep lamps and reflectors clean $6,394 $11,600 $6,861
101,114
kWh
$(-870.0)
-
MMBtu
$403
05 2.7421: Reduce glazed areas in buildings $22,077 $21,750 - $22,077
-
MMBtu
-
06 2.7111: Reduce illumination to minimum necessary levels $2,146 $465 $2,034
30,774
kWh
- $112
TOTAL RECOMMENDED $40,414 $45,815 $8,895
131,888
kWh
$31,004
-
MMBtu
$515
TOTAL IMPLEMENTED $32,721 $34,815 $8,895
131,888
kWh
$23,311
-
MMBtu
$515
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs