Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,591

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0457 #04 Y:2017 Install vinyl strip / high speed / air curtain doors $560 $200
SU0457 #03 Y:2017 Reduce space conditioning during non-working hours $90 -
SU0457 #02 Y:2017 Apply for tax-free status for energy purchases $157 -
SU0457 #01 Y:2017 Apply for tax-free status for energy purchases $8,223 -
AS0451 #05 Y:2017 Regrind, reuse, or sell scrap plastic parts $7,840 $5
AS0451 #04 Y:2017 Cover open tanks $544 $295
AS0451 #03 Y:2017 Install occupancy sensors $1,644 $1,725
AS0451 #02 Y:2017 Size electric motors for peak operating efficiency $762 -
AS0451 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $7,269 $18,026
SF0515 #03 Y:2017 Use solar heat to make electricty $15,870 $84,912
SF0515 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,072 $2,241
SF0515 #01 Y:2017 Turn off equipment during breaks, reduce operating time $2,061 $80
WV0559 #09 Y:2017 Analyze flue gas for proper air/fuel ratio $681 $3,000
WV0559 #08 Y:2017 Develop a repair/replace policy $2,043 $721
WV0559 #07 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,998 $7,133
WV0559 #06 Y:2017 Interlock heating and air conditioning systems to prevent simultaneous operation $2,563 $11,400
WV0559 #05 Y:2017 Establish a predictive maintenance program $4,560 $1,000
WV0559 #04 Y:2017 Provide proper maintenance of motor driven equipment $4,668 $19,300
WV0559 #03 Y:2017 Install occupancy sensors $6,517 $3,640
WV0559 #02 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $45,746 $111,500