ITAC Assessment: SU0457
ITAC logo
ITAC Assessment: SU0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Precision Machining
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 157
Plant Area 150,000
ft2
Annual Production 1,300,000
units
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,611 4,199,982
kWh
Electricity Demand $88,047 10,845
kW-mo/yr
Electricity Fees $6,218 -
Natural Gas $30,287 4,233
MMBtu
Waste Disposal Costs
Water Usage $92,168 853
Tgal
TOTAL YEARLY COSTS $363,331
RECOMMENDED SAVINGS* $34,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $8,223 - - - - - - $8,223
02 2.8121: Apply for tax-free status for energy purchases $157 - - - - - - $157
03 2.7224: Reduce space conditioning during non-working hours $90 - - - $90
-
MMBtu
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $560 $200 - - $560
-
MMBtu
- - -
05 3.1161: Eliminate/reduce an operation $10,228 $2,970 - - - $6,705 $3,523 -
06 2.4221: Install compressor air intakes in coolest locations $1,474 $1,455 $1,474
42,105
kWh
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $335 $430 $77
2,190
kWh
$24
-
kW-mo/yr
- $234 - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $12,156 $19,261 $4,453
127,231
kWh
$2,417
-
kW-mo/yr
- $5,286 - -
09 2.7314: Reduce ventilation air $1,478 $2,495 $336
9,609
kWh
- $1,142
-
MMBtu
- - -
10 2.6211: Conserve energy by efficient use of vending machines $288 $1,051 $288
8,223
kWh
- - - - -
TOTAL RECOMMENDED $34,989 $27,862 $6,628
189,358
kWh
$2,441
-
kW-mo/yr
$1,792
-
MMBtu
$12,225 $3,523 $8,380
TOTAL IMPLEMENTED $21,562 $20,942 $4,818
137,644
kWh
$2,441
-
kW-mo/yr
$560
-
MMBtu
$5,520 - $8,223
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs