ITAC Assessment: WV0559
ITAC logo
ITAC Assessment: WV0559
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 9
Plant Area 90,000
ft2
Annual Production 1,095,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,244 2,141,360
kWh
Electricity Demand $29,300 4,475
kW-mo/yr
Natural Gas $24,688 4,785
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $90,000 6,000,000
lb
TOTAL YEARLY COSTS $340,232
RECOMMENDED SAVINGS* $152,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $103,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $84,000 $3,000 - - - $90,000
-
lb
$(-6,000.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,746 $111,500 $41,665
454,856
kWh
$4,081
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $6,517 $3,640 $5,620
61,353
kWh
$897
-
kW-mo/yr
- - -
04 2.4313: Provide proper maintenance of motor driven equipment $4,668 $19,300 $4,249
46,390
kWh
$419
-
kW-mo/yr
- - -
05 2.4157: Establish a predictive maintenance program $4,560 $1,000 $4,154
45,348
kWh
$406
-
kW-mo/yr
- - -
06 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $2,563 $11,400 $1,348
14,717
kWh
$131
-
kW-mo/yr
$1,084
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,998 $7,133 $1,670
18,228
kWh
$328
-
kW-mo/yr
- - -
08 2.4151: Develop a repair/replace policy $2,043 $721 $1,860
20,305
kWh
$183
-
kW-mo/yr
- - -
09 2.1233: Analyze flue gas for proper air/fuel ratio $681 $3,000 - - $681
-
MMBtu
- -
TOTAL RECOMMENDED $152,776 $160,694 $60,566
661,197
kWh
$6,445
-
kW-mo/yr
$1,765
-
MMBtu
$90,000
-
lb
$(-6,000.0)
TOTAL IMPLEMENTED $103,786 $34,794 $17,553
191,624
kWh
$2,233
-
kW-mo/yr
- $90,000
-
lb
$(-6,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs