ITAC Assessment: BS0097
ITAC logo
ITAC Assessment: BS0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 91,476
ft2
Annual Production 341
Tgal
Production Hrs. Annual 2,600
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,516 947,628
kWh
Electricity Demand $15,067 2,784
kW-mo/yr
Electricity Fees $479 -
Natural Gas $38,403 5,571
MMBtu
Waste Disposal Costs
Water Usage $3,210 996
Tgal
Gaseous Waste $40,298 163,109
lb
TOTAL YEARLY COSTS $138,974
RECOMMENDED SAVINGS* $14,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Other Liquid (non-haz) Savings Gaseous Waste Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $1,590 $2,959 - - $1,590
-
MMBtu
- - -
02 3.4113: Treat and reuse rinse waters $870 $8,674 - - - $870
-
Tgal
- -
03 2.9114: Use solar heat to make electricty $6,781 $127,800 $6,781
154,786
kWh
- - - - -
04 3.5142: Treat and reuse equipment cleaning solutions $751 $5,250 - - - $196
-
Tgal
$555
-
gal
-
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $319 $2,189 $319
7,271
kWh
- - - - -
06 4.212: Adopt in-house material generation $3,137 $60,000 - - - - - $3,137
-
lb
07 2.7111: Reduce illumination to minimum necessary levels $236 $131 $165
3,757
kWh
$71
-
kW-mo/yr
- - - -
08 2.7135: Install occupancy sensors $212 $277 $212
4,830
kWh
- - - - -
09 2.7492: Use proper thickness of insulation on building envelope $140 $160 $140
3,149
kWh
- - - - -
TOTAL RECOMMENDED $14,036 $207,440 $7,617
173,793
kWh
$71
-
kW-mo/yr
$1,590
-
MMBtu
$1,066
-
Tgal
$555
-
gal
$3,137
-
lb
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Other Liquid (non-haz) Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs