ITAC Assessment: AS0451
ITAC logo
ITAC Assessment: AS0451
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Colored polymer pellets
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2816: Inorganic Pigments
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 100,000
ft2
Annual Production 3,500,000
units
Production Hrs. Annual 4,750
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,990 1,914,560
kWh
Electricity Demand $27,631 4,927
kW-mo/yr
Electricity Fees $445 -
Waste Disposal Costs
Solid Waste (non-haz) $9,800 10,000
lb
TOTAL YEARLY COSTS $190,866
RECOMMENDED SAVINGS* $18,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,269 $18,026 $5,909
74,801
kWh
$1,360
-
kW-mo/yr
-
02 2.4131: Size electric motors for peak operating efficiency $762 - $646
8,075
kWh
$116
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,644 $1,725 $1,644
20,808
kWh
- -
04 2.2514: Cover open tanks $544 $295 $461
5,833
kWh
$83
-
kW-mo/yr
-
05 3.5212: Regrind, reuse, or sell scrap plastic parts $7,840 $5 - - $7,840
-
lb
TOTAL RECOMMENDED $18,059 $20,051 $8,660
109,517
kWh
$1,559
-
kW-mo/yr
$7,840
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs