ITAC Assessment: UF0532
ITAC logo
ITAC Assessment: UF0532
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Rutile, Leucoxene, Ilmenite, Staurolite, Zircon and Kyanite
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 95,977
ton
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,874 2,528,400
kWh
Electricity Demand $57,840 13,043
kW-mo/yr
Electricity Fees $8,226 -
Natural Gas $797,516 233,264
MMBtu
TOTAL YEARLY COSTS $957,456
RECOMMENDED SAVINGS* $96,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,942

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.2437: Recover waste heat from equipment $40,174 $25,000 - - $40,174
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $23,919 $1,400 - - $23,919
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $9,352 $25,847 $5,847
158,040
kWh
$3,505
-
kW-mo/yr
- -
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,403 $5,998 $1,403
37,913
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,301 $421 $1,301
35,168
kWh
- - -
06 2.2511: Insulate bare equipment $1,094 $230 $1,094
29,569
kWh
- - -
07 3.7214: Reduce or eliminate waste $19,196 $40,500 - - - $19,196
TOTAL RECOMMENDED $96,439 $99,396 $9,645
260,690
kWh
$3,505
-
kW-mo/yr
$64,093
-
MMBtu
$19,196
TOTAL IMPLEMENTED $93,942 $93,168 $7,148
193,208
kWh
$3,505
-
kW-mo/yr
$64,093
-
MMBtu
$19,196
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs