2,629
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0285 #05 Y:1988 | 05 | 1988 | Utilize higher efficiency lamps and/or ballasts | $764 | $1,005 | |
| UD0285 #04 Y:1988 | 04 | 1988 | Recover waste heat from equipment | $941 | $1,000 | |
| UD0285 #03 Y:1988 | 03 | 1988 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $6,445 | $400 | |
| UD0285 #02 Y:1988 | 02 | 1988 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $3,183 | $2,400 | |
| UD0285 #01 Y:1988 | 01 | 1988 | Replace electrically-operated equipment with fossil fuel equipment | $1,196 | $700 | |
| UD0284 #07 Y:1988 | 07 | 1988 | Use demand controller or load shedder | $5,361 | $23,000 | |
| UD0284 #06 Y:1988 | 06 | 1988 | Eliminate or reduce compressed air usage | $2,404 | $2,300 | |
| UD0284 #05 Y:1988 | 05 | 1988 | Use waste heat from hot flue gases to preheat | $1,648 | - | |
| UD0284 #04 Y:1988 | 04 | 1988 | Utilize higher efficiency lamps and/or ballasts | $3,210 | - | |
| UD0284 #03 Y:1988 | 03 | 1988 | Install storm windows and doors | $14,561 | $55,000 | |
| UD0284 #02 Y:1988 | 02 | 1988 | Reschedule plant operations or reduce load to avoid peaks | $5,285 | - | |
| UD0284 #01 Y:1988 | 01 | 1988 | Change rate schedules or other changes in utility service | $38,356 | $20,000 | |
| UD0283 #04 Y:1988 | 04 | 1988 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $602 | $400 | |
| UD0283 #03 Y:1988 | 03 | 1988 | Reduce illumination to minimum necessary levels | $738 | - | |
| UD0283 #02 Y:1988 | 02 | 1988 | Replace electrically-operated equipment with fossil fuel equipment | $5,833 | $3,000 | |
| UD0283 #01 Y:1988 | 01 | 1988 | Change rate schedules or other changes in utility service | $1,105 | $2,000 | |
| TN0365 #13 Y:1988 | 13 | 1988 | Change rate schedules or other changes in utility service | $2,286 | - | |
| TN0365 #12 Y:1988 | 12 | 1988 | Conserve energy by efficient use of vending machines | $157 | $385 | |
| TN0365 #11 Y:1988 | 11 | 1988 | Install / repair insulation on condensate lines | $38 | $30 | |
| TN0365 #10 Y:1988 | 10 | 1988 | Utilize higher efficiency lamps and/or ballasts | $1,100 | $616 |