ITAC Assessment: UD0284
ITAC logo
ITAC Assessment: UD0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SPICES, EXTRACTS, SAUCES
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 239
Plant Area
n/a
Annual Production 11,300,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,977 5,837,046
kWh
Natural Gas $173,881 46,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,903

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $38,356 $20,000 - $45,671
-
MMBtu
$(-7,315.0)
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,285 - $5,355
-
kWh
- - $(-70.0)
03 2.7494: Install storm windows and doors $14,561 $55,000 - $14,561
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,210 - $1,783
84,408
kWh
$(-456.0)
-
MMBtu
- $1,883
05 2.2414: Use waste heat from hot flue gases to preheat $1,648 - - $1,648
-
MMBtu
- -
06 2.4239: Eliminate or reduce compressed air usage $2,404 $2,300 $1,127
53,341
kWh
$1,277
-
MMBtu
- -
07 2.3191: Use demand controller or load shedder $5,361 $23,000 $5,361
-
kWh
- - -
TOTAL RECOMMENDED $70,825 $100,300 $13,626
137,749
kWh
$62,701
-
MMBtu
$(-7,315.0)
-
MMBtu
$1,813
TOTAL IMPLEMENTED $50,903 $22,300 $8,265
137,749
kWh
$48,140
-
MMBtu
$(-7,315.0)
-
MMBtu
$1,813
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs