ITAC Assessment: UD0967
ITAC logo
ITAC Assessment: UD0967
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Thermoset for Heavy Trucking
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $50
M
to 100
M
# of Employees 368
Plant Area 291,200
ft2
Annual Production 447,772
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,236,317 16,312,800
kWh
Electricity Demand $137,369 30,775
kW-mo/yr
Electricity Fees $1,383 -
Natural Gas $457,010 124,900
MMBtu
Waste Disposal Costs
Water Usage $25,237 8,162
Tgal
Water Disposal $45,937 8,162
Tgal
TOTAL YEARLY COSTS $1,903,253
RECOMMENDED SAVINGS* $410,416 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $161,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $9,073 $18,000 - - $9,073
-
MMBtu
- - -
02 2.1212: Operate boilers on high fire setting $5,894 $27 - - $5,894
-
MMBtu
- - -
03 2.2113: Repair or replace steam traps $3,938 $7,676 - - $3,938
-
MMBtu
- - -
04 2.2123: Insulate feedwater tank $1,855 $4,743 - - $1,855
-
MMBtu
- - -
05 2.4113: Install motor voltage controller on lightly loaded motors $36,793 $4,925 $33,396
441,110
kWh
$3,397
-
kW-mo/yr
- - - -
06 2.4239: Eliminate or reduce compressed air usage $4,466 $5,000 $4,466
58,985
kWh
- - - - -
07 2.4226: Use / purchase optimum sized compressor $89,503 - $79,768
1,053,604
kWh
$9,735
-
kW-mo/yr
- - - -
08 4.463: Modify facility to avoid excess maintenance costs $32,400 $4,662 - - - - - $32,400
09 2.4239: Eliminate or reduce compressed air usage $22,781 $48,000 $13,427
177,354
kWh
$9,354
-
kW-mo/yr
- - - -
10 2.4239: Eliminate or reduce compressed air usage $11,958 - $11,958
157,945
kWh
- - - - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,362 - $3,067
40,509
kWh
$267
-
kW-mo/yr
- - - $(-972.0)
12 2.2511: Insulate bare equipment $6,116 $2,824 - - $6,116
-
MMBtu
- - -
13 3.4116: Meter recycled water (to reduce sewer charges) $5,271 $4,000 - - - - $5,271
-
Tgal
-
14 3.4151: Minimize water usage $13,765 $6,000 - - - $4,891
-
Tgal
$8,875
-
Tgal
-
15 2.7142: Utilize higher efficiency lamps and/or ballasts $9,735 $14,110 $6,814
90,000
kWh
$1,996
-
kW-mo/yr
- - - $925
16 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $121,762 $503,900 $117,344
1,549,916
kWh
$4,418
-
kW-mo/yr
- - - -
17 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,764 - $14,049
185,559
kWh
$1,715
-
kW-mo/yr
- - - -
18 2.4151: Develop a repair/replace policy $15,207 $65,253 $13,553
179,006
kWh
$1,654
-
kW-mo/yr
- - - -
19 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,773 $3,825 $1,631
21,450
kWh
$142
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $410,416 $692,945 $299,473
3,955,438
kWh
$32,678
-
kW-mo/yr
$26,876
-
MMBtu
$4,891
-
Tgal
$14,146
-
Tgal
$32,353
TOTAL IMPLEMENTED $161,264 $18,365 $93,817
1,239,163
kWh
$11,450
-
kW-mo/yr
$9,832
-
MMBtu
$4,891
-
Tgal
$8,875
-
Tgal
$32,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs