Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Packaging
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 150,000
ft2
Annual Production 550,000,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,622 2,363,423
kWh
Electricity Demand $37,317 550
kW-mo/yr
Electricity Fees $7,332 -
Natural Gas $126,664 29,428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $10,045 $3,500 - - - $10,045
02 4.514: Re-arrange equipment layout to reduce handling costs $6,750 $12,500 - - - $6,750
03 4.432: Cross-train personnel to avoid lost time $6,400 $15,000 - - - $6,400
04 2.7142: Utilize higher efficiency lamps and/or ballasts $670 $1,696 $371
13,189
kWh
$299
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $185 $115 $97
3,517
kWh
$88
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $94 $276 $74
2,638
kWh
$20
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,007 $40 $634
22,860
kWh
$373
-
kW-mo/yr
- -
08 2.4133: Use most efficient type of electric motors $1,707 $2,024 $1,076
38,687
kWh
$631
-
kW-mo/yr
- -
09 4.522: Modify storage space to avoid rental of a warehouse $38,290 $50,000 - - $38,290
-
lb
-
10 3.5314: Use in-process recycling whenever possible $480 $800 - - $480
-
lb
-
TOTAL RECOMMENDED $65,628 $85,951 $2,252
80,891
kWh
$1,411
-
kW-mo/yr
$38,770
-
lb
$23,195
TOTAL IMPLEMENTED $19,101 $22,611 $1,618
58,031
kWh
$1,038
-
kW-mo/yr
- $16,445
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs