Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,740

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1002 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $40,202 $1,850
UC2519 #06 Y:2025 Install timers and/or thermostats $8,951 $5,655
UC2519 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,040 $1,820
UC2519 #04 Y:2025 Install occupancy sensors $1,261 $6,650
UC2519 #03 Y:2025 Use photocell controls $1,471 $6,650
UC2519 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $868 $1,247
UC2519 #01 Y:2025 Insulate bare equipment $2,390 $2,700
ORC023 #03 Y:2025 Reduce heat gain by window tinting $82 $197
ORC023 #02 Y:2025 Insulate glazing, walls, ceilings, and roofs $940 $1,661
ORC023 #01 Y:2025 Install occupancy sensors $140 $160
UF0644 #09 Y:2025 Re-arrange equipment layout to reduce labor costs $1,008 $1,360
UF0644 #08 Y:2025 Improve space comfort conditioning $47,532 $12,400
UF0644 #07 Y:2025 Modify storage space to avoid rental of a warehouse $54,000 -
UF0644 #06 Y:2025 Install an uninteruptable power supply $52,901 $24,080
UF0644 #05 Y:2025 Install equipment to move product $138,087 $384,000
UF0644 #04 Y:2025 Use fixtures to reduce machine changeout times $148,800 $220,000
UF0644 #03 Y:2025 Use or replace with energy efficient substitutes $46,082 $37,000
UF0644 #02 Y:2025 Install soft-start to eliminate nuisance trips $1,140 $4,477
UF0644 #01 Y:2025 Use demand controller or load shedder $7,758 $3,728
MZ0392 #10 Y:2025 Reduce space conditioning during non-working hours $19,865 $1,400