Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,031

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1163 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,052 $12,414
OK1163 #01 Y:2025 Use solar heat to make electricty $10,845 $62,586
NT0053 #06 Y:2025 Lower temperature during the winter season and vice-versa $1,592 -
NT0053 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,252 $2,157
NT0053 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $6,767 -
NT0053 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $12,473 $5,753
NT0053 #02 Y:2025 Optimize plant power factor $18,726 $25,437
NT0053 #01 Y:2025 Apply for tax-free status for energy purchases $41,635 $5,000
NL0124 #05 Y:2025 Install compressor air intakes in coolest locations $1,720 $4,170
NL0124 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,696 $1,000
NL0124 #03 Y:2025 Install occupancy sensors $5,075 $11,340
NL0124 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $10,061 $11,592
NL0124 #01 Y:2025 Upgrade obsolete equipment $263,952 $875,540
IC0339 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $822 $400
IC0339 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $525 $288
IC0339 #05 Y:2025 Use or replace with energy efficient substitutes $3,074 $950
IC0339 #04 Y:2025 Use or replace with energy efficient substitutes $2,474 $2,300
IC0339 #03 Y:2025 Adopt in-house material generation $7,821 $66,659
IC0339 #02 Y:2025 Use solar heat to make electricty $134,142 $691,579
IC0339 #01 Y:2025 Install compressor air intakes in coolest locations $1,251 $780