ITAC Assessment: UC2519
ITAC logo
ITAC Assessment: UC2519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product NA
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 138
Plant Area 30,810
ft2
Annual Production 1
units
Production Hrs. Annual 1,755
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,680 37,302
kWh
Electricity Demand $18,569 542
kW-mo/yr
LPG $5,316 129
MMBtu
Fuel Oil #2 $35,069 1,945
MMBtu
TOTAL YEARLY COSTS $63,634
RECOMMENDED SAVINGS* $24,981 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings
01 2.2511: Insulate bare equipment $2,390 $2,700 - - - $2,390
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $868 $1,247 $407
3,132
kWh
$461
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $1,471 $6,650 $1,329
10,223
kWh
$142
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $1,261 $6,650 $1,139
8,762
kWh
$122
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,040 $1,820 $7,377
56,743
kWh
$2,663
-
kW-mo/yr
- -
06 2.7261: Install timers and/or thermostats $8,951 $5,655 $461
3,452
kWh
- $1,470
-
MMBtu
$7,020
-
MMBtu
TOTAL RECOMMENDED $24,981 $24,722 $10,712
82,312
kWh
$3,388
-
kW-mo/yr
$1,470
-
MMBtu
$9,410
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs