ITAC Assessment: TN0394
ITAC logo
ITAC Assessment: TN0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MILK, CREAM, JUICES
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 154
Plant Area
n/a
Annual Production 312,000
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $432,957 7,589,391
kWh
Natural Gas $85,110 22,425
MMBtu
Fuel Oil #2 $2,678 536
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2447: Heat water with exhaust heat $54,274 $73,320 - $52,854
-
MMBtu
$1,420
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $5,454 $2,060 - $5,309
-
MMBtu
$145
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,219 $1,000 - $2,219
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,298 - $6,298
110,492
kWh
- -
05 2.2511: Insulate bare equipment $513 $565 - $498
-
MMBtu
$15
-
MMBtu
06 2.7261: Install timers and/or thermostats $1,838 $840 $1,838
32,239
kWh
- -
07 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $668 $1,963 $668
11,723
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $451 $270 $451
7,913
kWh
- -
09 2.2511: Insulate bare equipment $167 $459 $167
2,931
kWh
- -
TOTAL RECOMMENDED $71,882 $80,477 $9,422
165,298
kWh
$60,880
-
MMBtu
$1,580
-
MMBtu
TOTAL IMPLEMENTED $14,876 $5,592 $9,422
165,298
kWh
$5,309
-
MMBtu
$145
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs