ITAC Assessment: TN0211
ITAC logo
ITAC Assessment: TN0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CUSTOM METAL & PLASTIC
NAICS
n/a
SIC 3549: Metalworking Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,784
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,252 643,904
kWh
Natural Gas $25,962 4,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,307 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6124: Establish equipment maintenance schedule $890 - - $890
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,051 - $1,051
26,377
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,366 $2,753 $1,366
34,291
kWh
-
TOTAL RECOMMENDED $3,307 $2,753 $2,417
60,668
kWh
$890
-
MMBtu
TOTAL IMPLEMENTED $2,417 $2,753 $2,417
60,668
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs