| Assessment Year | 2026 |
|---|---|
| Principal Product | precision parts |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 32 |
| Plant Area |
51,000
ft2
|
| Annual Production | 109,965
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $82,030 | 1,015,444 |
kWh
|
$0.081 |
| Electricity Demand | $34,474 | 3,614 |
kW-mo/yr
|
$9.54 |
| LPG | $20,272 | 1,079 |
MMBtu
|
$18.79 |
| TOTAL YEARLY COSTS | $136,776 | |||
| RECOMMENDED SAVINGS* | $150,808 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,718 | $9,190 |
$7,718
95,290
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,123 | $9,500 |
$3,111
38,413
kWh
|
$939
-
kW-mo/yr
|
- | $2,073 | |
| 03 | 2.7135: Install occupancy sensors | $130 | $460 |
$100
1,235
kWh
|
$30
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,559 | $500 |
$1,340
16,559
kWh
|
$219
-
kW-mo/yr
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $3,904 | $10,250 | - | - |
$3,904
-
MMBtu
|
- | |
| 06 | 2.9114: Use solar heat to make electricty | $89,166 | $755,622 |
$83,928
1,036,141
kWh
|
$5,238
-
kW-mo/yr
|
- | - | |
| 07 | 2.2622: Replace existing chiller with high efficiency model | $20,181 | $62,500 |
$15,500
191,362
kWh
|
$4,681
-
kW-mo/yr
|
- | - | |
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $462 | $530 |
$462
5,707
kWh
|
- | - | - | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,700 | $1,000 |
$1,306
16,124
kWh
|
$394
-
kW-mo/yr
|
- | - | |
| 10 | 2.7224: Reduce space conditioning during non-working hours | $19,865 | $1,400 |
$7,734
95,486
kWh
|
- |
$12,131
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $150,808 | $850,952 |
$121,199
1,496,317
kWh
|
$11,501
-
kW-mo/yr
|
$16,035
-
MMBtu
|
$2,073 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs