ITAC Assessment: MZ0392
ITAC logo
ITAC Assessment: MZ0392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product precision parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 51,000
ft2
Annual Production 109,965
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,030 1,015,444
kWh
Electricity Demand $34,474 3,614
kW-mo/yr
LPG $20,272 1,079
MMBtu
TOTAL YEARLY COSTS $136,776
RECOMMENDED SAVINGS* $150,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,718 $9,190 $7,718
95,290
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,123 $9,500 $3,111
38,413
kWh
$939
-
kW-mo/yr
- $2,073
03 2.7135: Install occupancy sensors $130 $460 $100
1,235
kWh
$30
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,559 $500 $1,340
16,559
kWh
$219
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $3,904 $10,250 - - $3,904
-
MMBtu
-
06 2.9114: Use solar heat to make electricty $89,166 $755,622 $83,928
1,036,141
kWh
$5,238
-
kW-mo/yr
- -
07 2.2622: Replace existing chiller with high efficiency model $20,181 $62,500 $15,500
191,362
kWh
$4,681
-
kW-mo/yr
- -
08 2.6212: Turn off equipment during breaks, reduce operating time $462 $530 $462
5,707
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,700 $1,000 $1,306
16,124
kWh
$394
-
kW-mo/yr
- -
10 2.7224: Reduce space conditioning during non-working hours $19,865 $1,400 $7,734
95,486
kWh
- $12,131
-
MMBtu
-
TOTAL RECOMMENDED $150,808 $850,952 $121,199
1,496,317
kWh
$11,501
-
kW-mo/yr
$16,035
-
MMBtu
$2,073
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs