| Assessment Year | 2011 |
|---|---|
| Principal Product | drink |
| NAICS | 312140: Distilleries |
| SIC | 2085: Distilled and Blended Liquors |
| Sales Range | $100 M to 500M |
| # of Employees | 270 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 11,000,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $697,072 | 11,269,743 |
kWh
|
$0.062 |
| Electricity Demand | $159,541 | 24,525 |
kW-mo/yr
|
$6.51 |
| Natural Gas | $36,620 | 3,068 |
MMBtu
|
$11.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $143,720 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,055 | $43,715 |
$19,851
275,064
kWh
|
$204
-
kW-mo/yr
|
- | |
| 02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $6,009 | $1,320 |
$5,617
93,896
kWh
|
$392
-
kW-mo/yr
|
- | |
| 03 | 2.7141: Lower light fixtures in high ceiling areas | $11,224 | $3,045 |
$11,041
145,829
kWh
|
$183
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $3,392 | $396 |
$3,392
53,839
kWh
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,063 | - |
$2,063
23,027
kWh
|
- | - | |
| 06 | 2.4226: Use / purchase optimum sized compressor | $86,813 | $350,000 |
$84,593
1,364,400
kWh
|
$2,220
-
kW-mo/yr
|
- | |
| 07 | 2.2514: Cover open tanks | $2,910 | $1,175 | - | - |
$2,910
-
MMBtu
|
|
| 08 | 2.6231: Utilize controls to operate equipment only when needed | $9,593 | $25,700 |
$9,593
127,911
kWh
|
- | - | |
| 09 | 2.2611: Moderate cooling tower outlet temperature | $1,662 | $8,210 |
$1,579
18,505
kWh
|
$83
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $143,720 | $433,561 |
$137,728
2,102,471
kWh
|
$3,081
-
kW-mo/yr
|
$2,910
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs