ITAC Assessment: NC0378
ITAC logo
ITAC Assessment: NC0378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 95,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 8,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,925 7,813,750
kWh
Electricity Demand $137,436 16,301
kW-mo/yr
Electricity Fees $4,059 -
LPG $510,566 253,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $453,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $342,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $97,991 $50,000 $(-30,624.0)
(-13,200,000)
kWh
$(-22,202.0)
-
kW-mo/yr
- - $150,817
-
MMBtu
- - - -
02 2.1321: Replace fossil fuel equipment with electrical equipment $56,045 $85,000 $(-38,587.0)
(-1,663,240)
kWh
$(-19,518.0)
-
kW-mo/yr
- - $114,150
-
MMBtu
- - - -
03 2.6218: Turn off equipment when not in use $3,480 $500 $3,480
149,760
kWh
- - - - - - - -
04 2.7244: Revise smoke cleanup from operations $2,215 $7,700 - - - - $2,215
-
MMBtu
- - - -
05 2.2437: Recover waste heat from equipment $17,355 $7,450 - - - - $17,355
-
MMBtu
- - - -
06 2.4226: Use / purchase optimum sized compressor $2,591 $7,700 $1,721
74,176
kWh
$870
-
kW-mo/yr
- - - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,481 $100 $1,591
68,591
kWh
$790
-
kW-mo/yr
- - - $(-600.0) - $(-300.0) -
08 4.321: Optimize production lot sizes and inventories $226,587 $37,500 $487
21,000
kWh
- - $201,100
-
MMBtu
- - $25,000 - -
09 4.321: Optimize production lot sizes and inventories $10,000 $1,000 - - - - - - - - $10,000
10 2.8114: Change rate schedules or other changes in utility service $32,100 $100,000 $32,467
-
kWh
- $(-367.0) - - - - - -
11 2.7134: Use photocell controls $3,452 $12,000 $1,855
79,953
kWh
$1,597
-
kW-mo/yr
- - - - - - -
TOTAL RECOMMENDED $453,297 $308,950 $(-27,610.0)
(-14,469,760)
kWh
$(-38,463.0)
-
kW-mo/yr
$(-367.0) $201,100
-
MMBtu
$284,537
-
MMBtu
$(-600.0) $25,000 $(-300.0) $10,000
TOTAL IMPLEMENTED $342,102 $108,300 $(-24,970.0)
(-12,956,280)
kWh
$(-18,945.0)
-
kW-mo/yr
- $201,100
-
MMBtu
$150,817
-
MMBtu
$(-600.0) $25,000 $(-300.0) $10,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs