ITAC Assessment: UF0530
ITAC logo
ITAC Assessment: UF0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Zircon, Staurolite and Ilmenite
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 110,000
ft2
Annual Production 15,354
ton
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $992,031 27,705,098
kWh
Electricity Demand $222,683 46,791
kW-mo/yr
Electricity Fees $60,080 -
Natural Gas $899,338 253,251
MMBtu
TOTAL YEARLY COSTS $2,174,132
RECOMMENDED SAVINGS* $260,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $252,027

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $94,823 $80,000 $49,869
1,385,255
kWh
- $44,954
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $60,494 $202,420 $44,727
1,242,425
kWh
$15,767
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $47,739 $25,000 - - $47,739
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $43,693 $25,000 - - $43,693
-
MMBtu
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,859 $22,491 $5,859
162,751
kWh
- - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,402 - $1,570
43,624
kWh
- - $931 $901
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,876 $421 $1,876
52,101
kWh
- - - -
08 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,535 $5,998 $1,535
42,633
kWh
- - - -
09 2.5121: Redesign flow to minimize mass transfer length $1,181 $2,000 $1,181
32,815
kWh
- - - -
TOTAL RECOMMENDED $260,602 $363,330 $106,617
2,961,604
kWh
$15,767
-
kW-mo/yr
$136,386
-
MMBtu
$931 $901
TOTAL IMPLEMENTED $252,027 $332,841 $98,042
2,723,405
kWh
$15,767
-
kW-mo/yr
$136,386
-
MMBtu
$931 $901
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs