Assessment Year | 2019 |
---|---|
Principal Product | Zircon, Staurolite and Ilmenite |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
110,000
ft2
|
Annual Production | 15,354
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $992,031 | 27,705,098 |
kWh
|
$0.036 |
Electricity Demand | $222,683 | 46,791 |
kW-mo/yr
|
$4.76 |
Electricity Fees | $60,080 | - |
|
- |
Natural Gas | $899,338 | 253,251 |
MMBtu
|
$3.55 |
TOTAL YEARLY COSTS | $2,174,132 | |||
RECOMMENDED SAVINGS* | $260,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $252,027 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $94,823 | $80,000 |
$49,869
1,385,255
kWh
|
- |
$44,954
-
MMBtu
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $60,494 | $202,420 |
$44,727
1,242,425
kWh
|
$15,767
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $47,739 | $25,000 | - | - |
$47,739
-
MMBtu
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $43,693 | $25,000 | - | - |
$43,693
-
MMBtu
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,859 | $22,491 |
$5,859
162,751
kWh
|
- | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,402 | - |
$1,570
43,624
kWh
|
- | - | $931 | $901 | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,876 | $421 |
$1,876
52,101
kWh
|
- | - | - | - | |
08 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,535 | $5,998 |
$1,535
42,633
kWh
|
- | - | - | - | |
09 | 2.5121: Redesign flow to minimize mass transfer length | $1,181 | $2,000 |
$1,181
32,815
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $260,602 | $363,330 |
$106,617
2,961,604
kWh
|
$15,767
-
kW-mo/yr
|
$136,386
-
MMBtu
|
$931 | $901 | ||
TOTAL IMPLEMENTED | $252,027 | $332,841 |
$98,042
2,723,405
kWh
|
$15,767
-
kW-mo/yr
|
$136,386
-
MMBtu
|
$931 | $901 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs