ITAC Assessment: UD0053
ITAC logo
ITAC Assessment: UD0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SPECIAL MACHINES
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,481 1,246,190
kWh
Natural Gas $25,565 5,779
MMBtu
Fuel Oil #2 $7,131 854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1332: Convert combustion equipment to burn natural gas $3,281 $2,500 - $(-3,850.0)
-
MMBtu
$7,131
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,215 $498 $5,036
94,373
kWh
$(-821.0)
-
MMBtu
-
03 2.7421: Reduce glazed areas in buildings $4,533 $5,752 - $4,533
-
MMBtu
-
04 2.7492: Use proper thickness of insulation on building envelope $7,670 $92,250 - $7,670
-
MMBtu
-
TOTAL RECOMMENDED $19,699 $101,000 $5,036
94,373
kWh
$7,532
-
MMBtu
$7,131
-
MMBtu
TOTAL IMPLEMENTED $7,670 $92,250 - $7,670
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs