ITAC Assessment: OR0337
ITAC logo
ITAC Assessment: OR0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product PVC Pipe
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 225,000
ft2
Annual Production 73,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,643 9,688,453
kWh
Electricity Demand $57,201 173,028
kW-mo/yr
Electricity Fees $6,248 -
Natural Gas $28,300 5,520
MMBtu
LPG $12,644 1,933
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,009

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $44,432 $21,400 $44,432
1,334,701
kWh
- - - - -
02 2.8114: Change rate schedules or other changes in utility service $2,060 - - - - $2,060 - -
03 2.2511: Insulate bare equipment $9,949 $13,663 $9,949
251,172
kWh
- - - - -
04 3.1162: Use less wasteful packaging $34,000 $73,000 - $1,200
-
lb
$15,500 - $17,300 -
05 4.621: Use fixtures to reduce machine changeout times $11,000 $28,700 - - - - - $11,000
TOTAL RECOMMENDED $101,441 $136,763 $54,381
1,585,873
kWh
$1,200
-
lb
$15,500 $2,060 $17,300 $11,000
TOTAL IMPLEMENTED $23,009 $42,363 $9,949
251,172
kWh
- - $2,060 - $11,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs