Assessment Year | 2005 |
---|---|
Principal Product | Remanufacture of Rail Equipment |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
347,695
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,515 | 2,347,271 |
kWh
|
$0.054 |
Electricity Demand | $47,242 | 8,914 |
kW-mo/yr
|
$5.30 |
Electricity Fees | $6,691 | - |
|
- |
Natural Gas | $63,074 | 5,210 |
MMBtu
|
$12.11 |
Fuel Oil #2 | $37,284 | 2,613 |
MMBtu
|
$14.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,473 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,457 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $20,043 | - |
$15,824
293,046
kWh
|
$4,219
-
kW-mo/yr
|
- | |
02 | 2.4314: Use synthetic lubricant | $1,767 | - |
$1,396
25,857
kWh
|
$371
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,455 | - |
$1,148
21,260
kWh
|
$307
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $320 | - |
$251
4,641
kWh
|
$69
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $7,835 | $444 |
$6,187
114,566
kWh
|
$1,648
-
kW-mo/yr
|
- | |
06 | 2.1222: Install turbulators | $1,056 | $271 | - | - |
$1,056
-
MMBtu
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,388 | $2,015 |
$3,466
64,178
kWh
|
$922
-
kW-mo/yr
|
- | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $3,125 | $5,000 | - | - |
$3,125
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $129 | $1,155 |
$113
2,084
kWh
|
$16
-
kW-mo/yr
|
- | |
10 | 2.6211: Conserve energy by efficient use of vending machines | $259 | $721 |
$227
4,205
kWh
|
$32
-
kW-mo/yr
|
- | |
11 | 2.7135: Install occupancy sensors | $96 | $391 |
$64
1,193
kWh
|
$32
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $40,473 | $9,997 |
$28,676
531,030
kWh
|
$7,616
-
kW-mo/yr
|
$4,181
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,457 | $4,282 |
$22,489
416,464
kWh
|
$5,968
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs