ITAC Assessment: SU0221
ITAC logo
ITAC Assessment: SU0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Remanufacture of Rail Equipment
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 347,695
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,515 2,347,271
kWh
Electricity Demand $47,242 8,914
kW-mo/yr
Electricity Fees $6,691 -
Natural Gas $63,074 5,210
MMBtu
Fuel Oil #2 $37,284 2,613
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,473 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,457

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $20,043 - $15,824
293,046
kWh
$4,219
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $1,767 - $1,396
25,857
kWh
$371
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,455 - $1,148
21,260
kWh
$307
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $320 - $251
4,641
kWh
$69
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $7,835 $444 $6,187
114,566
kWh
$1,648
-
kW-mo/yr
-
06 2.1222: Install turbulators $1,056 $271 - - $1,056
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,388 $2,015 $3,466
64,178
kWh
$922
-
kW-mo/yr
-
08 2.2414: Use waste heat from hot flue gases to preheat $3,125 $5,000 - - $3,125
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $129 $1,155 $113
2,084
kWh
$16
-
kW-mo/yr
-
10 2.6211: Conserve energy by efficient use of vending machines $259 $721 $227
4,205
kWh
$32
-
kW-mo/yr
-
11 2.7135: Install occupancy sensors $96 $391 $64
1,193
kWh
$32
-
kW-mo/yr
-
TOTAL RECOMMENDED $40,473 $9,997 $28,676
531,030
kWh
$7,616
-
kW-mo/yr
$4,181
-
MMBtu
TOTAL IMPLEMENTED $28,457 $4,282 $22,489
416,464
kWh
$5,968
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs