ITAC Assessment: SF0235
ITAC logo
ITAC Assessment: SF0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Salts
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,376
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $982,964 15,145,292
kWh
Natural Gas $2,500,000 483,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $411,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,408

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,373 $300 $2,373
22,914
kWh
- - -
02 2.2312: Minimize non-essential material in heat treatment process $5,997 $206 $5,997
339,977
kWh
- - -
03 2.4133: Use most efficient type of electric motors $11,612 $3,553 $11,612
98,603
kWh
- - -
04 2.2437: Recover waste heat from equipment $298,248 $112,368 n/a - $298,248
-
MMBtu
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,228 $2,805 $7,228
61,436
kWh
- - -
06 3.1223: Use fog nozzles / spray rinsing instead of immersion rinsing $4,004 $2,461 $4,004
39,413
kWh
- - -
07 2.4223: Install direct acting units in place of compressed air pressure system in safety system $9,286 $6,700 $9,286
55,431
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $30,822 $26,538 $30,822
258,555
kWh
- - -
09 2.5123: Reduce fluid flow rates $3,202 $3,675 $3,202
27,440
kWh
- - -
10 2.5123: Reduce fluid flow rates $10,502 $13,250 $10,502
72,210
kWh
- - -
11 2.7134: Use photocell controls $15,213 $20,160 $15,213
126,903
kWh
- - -
12 2.7132: Install timers on light switches in little used areas $1,357 $1,750 $1,357
11,179
kWh
- - -
13 3.5217: Reuse / recycle/ sell paper products $7,395 - - - $7,395
-
lb
-
14 2.3212: Optimize plant power factor $4,195 $7,970 - - - $4,195
TOTAL RECOMMENDED $411,434 $201,736 $101,596
1,114,061
kWh
$298,248
-
MMBtu
$7,395
-
lb
$4,195
TOTAL IMPLEMENTED $25,408 $14,628 $21,213
182,953
kWh
- - $4,195
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs