ITAC Assessment: AS0446
ITAC logo
ITAC Assessment: AS0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Heat Exchangers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 46,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,766 1,352,520
kWh
Electricity Demand $45,166 4,186
kW-mo/yr
Electricity Fees $27,235 -
Natural Gas $41,584 5,510
MMBtu
Waste Disposal Costs
Water Usage $43,567 4,315
Tgal
TOTAL YEARLY COSTS $262,318
RECOMMENDED SAVINGS* $18,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,695

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,695 $180 $12,993
169,865
kWh
$3,702
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,288 $1,482 $952
16,879
kWh
$336
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $982 $950 $689
9,027
kWh
$293
-
kW-mo/yr
TOTAL RECOMMENDED $18,965 $2,612 $14,634
195,771
kWh
$4,331
-
kW-mo/yr
TOTAL IMPLEMENTED $16,695 $180 $12,993
169,865
kWh
$3,702
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs