ITAC Assessment: UF0644
ITAC logo
ITAC Assessment: UF0644
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Antimicrobial Wipes
NAICS 322291: Sanitary Paper Product Manufacturing
SIC 2676: Sanitary Paper Products
Sales Range $10
M
to 50
M
# of Employees 31
Plant Area 70,000
ft2
Annual Production 1,313,900
units
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,196 692,863
kWh
Electricity Demand $26,285 3,129
kW-mo/yr
Electricity Fees $23,936 -
TOTAL YEARLY COSTS $101,417
RECOMMENDED SAVINGS* $497,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $7,758 $3,728 $5,127
69,287
kWh
$2,631
-
kW-mo/yr
- -
02 2.4112: Install soft-start to eliminate nuisance trips $1,140 $4,477 $1,140
15,402
kWh
- - -
03 2.4322: Use or replace with energy efficient substitutes $46,082 $37,000 $(-2,424.0)
(-32,752)
kWh
$(-1,494.0)
-
kW-mo/yr
- $50,000
04 4.621: Use fixtures to reduce machine changeout times $148,800 $220,000 - - - $148,800
05 4.445: Install equipment to move product $138,087 $384,000 $(-3,694.0)
(-49,920)
kWh
$(-2,419.0)
-
kW-mo/yr
$44,200 $100,000
06 4.631: Install an uninteruptable power supply $52,901 $24,080 $(-592.0)
(-8,000)
kWh
$(-806.0)
-
kW-mo/yr
- $54,299
07 4.522: Modify storage space to avoid rental of a warehouse $54,000 - - - - $54,000
08 4.424: Improve space comfort conditioning $47,532 $12,400 $(-1,220.0)
(-16,487)
kWh
$(-752.0)
-
kW-mo/yr
- $49,504
09 4.513: Re-arrange equipment layout to reduce labor costs $1,008 $1,360 - - $1,008 -
TOTAL RECOMMENDED $497,308 $687,045 $(-1,663.0)
(-22,470)
kWh
$(-2,840.0)
-
kW-mo/yr
$45,208 $456,603
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs