ITAC Assessment: UM0215
ITAC logo
ITAC Assessment: UM0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Sand Castings
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 6
Plant Area 12,720
ft2
Annual Production 100
ton
Production Hrs. Annual 2,100
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,660 224,400
kWh
Natural Gas $7,205 1,667
MMBtu
Other Energy $29 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.5221: Recycle casting sand $12,300 $50,000 - - $12,300
-
lb
02 2.6218: Turn off equipment when not in use $1,824 $1,000 $1,824
18,779
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $980 $225 $980
10,153
kWh
- -
04 2.2437: Recover waste heat from equipment $730 $1,000 - $730
-
MMBtu
-
05 2.2511: Insulate bare equipment $366 $31 $366
3,809
kWh
- -
TOTAL RECOMMENDED $16,200 $52,256 $3,170
32,741
kWh
$730
-
MMBtu
$12,300
-
lb
TOTAL IMPLEMENTED - - - - -