ITAC Assessment: SD0572
ITAC logo
ITAC Assessment: SD0572
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Medical reagents
NAICS 325413: In-Vitro Diagnostic Substance Manufacturing
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $100
M
to 500
M
# of Employees 280
Plant Area 128,000
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 4,331
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $547,964 4,821,132
kWh
Electricity Demand $304,986 8,864
kW-mo/yr
Electricity Fees $925 -
Natural Gas $63,762 10,068
MMBtu
TOTAL YEARLY COSTS $917,637
RECOMMENDED SAVINGS* $100,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $75,389 $234,915 $13,316
120,510
kWh
$62,073
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $21,304 $22,430 $10,117
91,565
kWh
$10,868
-
kW-mo/yr
$319
03 2.4239: Eliminate or reduce compressed air usage $2,372 - $2,372
21,468
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $970 $1,350 $970
8,776
kWh
- -
05 2.7135: Install occupancy sensors $349 $378 $349
3,159
kWh
- -
TOTAL RECOMMENDED $100,384 $259,073 $27,124
245,478
kWh
$72,941
-
kW-mo/yr
$319
TOTAL IMPLEMENTED $100,384 $259,073 $27,124
245,478
kWh
$72,941
-
kW-mo/yr
$319
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs